Hard at work
There's no slowing down for us to enjoy the gorgeous weather we've been having. We have been busy installing an 800m² concrete floor at Sizewell A Power Station reinforced with over 30 tonnes of steel. After several weeks of preparation works leading up to the concrete pours we are now part way through the final stages.
We'll show you the finished floor soon!